Interior Design
Space planning, materials, lighting, & 3D visualization for flawless execution.
From first sketch to handover, our multidisciplinary team and in-house fabrication deliver predictable timelines, precise finishes, and measurable results.
From first sketch to handover, our multidisciplinary team and in-house fabrication deliver predictable timelines, precise finishes, and measurable results.

Space planning, materials, lighting, & 3D visualization for flawless execution.

Single-point accountability from approvals to handover.

Project Management

Guest flow, acoustics, kitchen adjacencies—built for operations.

Productivity-driven layouts with acoustic comfort and brand touchpoints.

Luxury villas & condos with craftsmanship that lasts.

Conversion-driven environments

Design & Renovation

In-house CNC precision for bespoke joinery and metal.

Photoreal, VR previews

Authority / Mall / Landlord

DLP
70+ completed projects across hospitality and leisure, corporate offices, restaurant renovations, residential luxury homes, and retail/commercial spaces.
GA plans, RCP/lighting, power/data, elevations, sections, joinery details, reflected shop drawings.
Finishes, lighting, FF&E, sanitary, ironmongery.
Material data sheets (low-VOC, FSC options), installation methods, performance criteria.
Checklists by trade; mock-up approvals; sign-off gates.
Site safety plans; method statements; toolbox talks; permits.
CAD/Revit base files; 3D assets; version control.
As-builts, O&M manuals, warranties.
GA plans, RCP/lighting, power/data, elevations, sections, joinery details, reflected shop drawings.
Finishes, lighting, FF&E, sanitary, ironmongery.
Material data sheets (low-VOC, FSC options), installation methods, performance criteria.
Checklists by trade; mock-up approvals; sign-off gates.
Site safety plans; method statements; toolbox talks; permits.
CAD/Revit base files; 3D assets; version control.
As-builts, O&M manuals, warranties.
(guidance; confirm per scope)
Phase 1
Concept + Schematic: 2–4 weeks
Phase 2
3–6 weeks
Phase 3
2–8 weeks (by complexity, custom items)
Phase 4
4–16+ weeks (size/permit constraints)
(guidance; confirm per scope)
Phase 1
Concept + Schematic: 2–4 weeks
Phase 2
3–6 weeks
Phase 3
2–8 weeks (by complexity, custom items)
Phase 4
4–16+ weeks (size/permit constraints)
BOH/FOH checklist + permit guide (PDF)
(Sheet + PDF)
(PDF)
(PDF)
BOH/FOH checklist + permit guide (PDF)
(Sheet + PDF)
(PDF)
(PDF)
Design-Only delivers complete drawings/specs; you may tender to any contractor. Design & Build adds procurement, in-house fabrication, and site execution with single-point accountability.
Our 3D renderings closely match final execution with realistic materials, lighting, and layout representation. Minor variations may occur depending on site conditions and material availability.
Yes. We coordinate with mall/landlord requirements, review technical manuals, and ensure all drawings, materials, and MEP plans comply for smooth approval.
We do. Upon request, we recommend eco-friendly materials, low-VOC finishes, and energy-efficient solutions without compromising aesthetics or durability.
Post-completion support includes inspection, minor touch-ups, and guidance on maintenance and material care to ensure long-term performance and finish quality.